An analysis has found that the construction of a 100MW-class AI (artificial intelligence) data center could generate a total production effect of up to 3.5 trillion won across the entire industry. It was revealed that investment in data centers impacts not only regional production, value-added, and employment, but also the expansion of tax revenue.
According to an investigative response titled "Employment, Production, and Value-Added Creation Effects of Data Centers" submitted by the National Assembly Research Service to the Hwang Jeong-a (Rep.) Office on the 30th, domestic and international studies estimate the production creation effect of a 100MW-class AIDC (AI data center) to be approximately 500 billion to 3.5 trillion won.
The 105MW-class AIDC being promoted by Busan City in partnership with Equis Asset Management is a representative example. For this project, which involves an investment of 1.8 trillion won, the production induction effect was estimated at 3.492 trillion won, and the value-added creation effect at 1.332 trillion won. This means that approximately 0.74 won in additional value is generated for every 1 won invested.
Other analyses have also confirmed that data centers have an effect of boosting production in surrounding industries. According to a study by Goyang Research Institute utilizing the Bank of Korea's 2020 inter-regional input-output table, the production induction coefficient for data centers was found to be 1.89068. This means that if final demand of 10 billion won occurs in the data center sector, approximately 18.9 billion won in production is induced in the Goyang region. The value-added induction coefficient was 0.75779, indicating that final demand of the same scale generates approximately 7.6 billion won in value-added.
There is also research suggesting that a shortage of AI data center supply could lower overall industrial production. Researchers Nam Sang-jun, Yoo Hyeon-soo, and Seok Wang-heon applied the Bank of Korea's 2023 input-output table to estimate that if 100MW-scale AIDCs are not supplied smoothly, total industrial production would decrease by approximately 1.17 trillion to 3.6 trillion won. This implies that AIDCs serve as intermediate goods necessary for the production of other industries, including AI services.
While employment effects do occur, a trend was observed where direct employment per unit of power capacity decreases as facilities become larger. The permanent operating personnel for an AIDC were surveyed to be approximately 0.2 to 3 people per 1MW of power intake capacity. However, U.S. studies analyzed the total employment multiplier, including indirect and derived effects, at a level of 3.5 to 5.5 for every one direct data center job.
There is also a tax revenue effect for local governments. According to PwC, tax revenue related to the U.S. data center industry was $204.4 billion in 2024, a 24% increase from the previous year. Tax revenue related to data centers in Virginia was $2.677 billion, which accounted for approximately one-quarter of the state government's higher education expenditure.
However, the National Assembly Research Service pointed out that caution is required in uniformly applying individual figures to all AIDCs, as there are no clear criteria for hyperscale AIDCs and analysis methods and project conditions vary by study. As competition to attract AIDCs, which require enormous costs for securing power grids and sites, expands, the extent to which production, value-added, and tax revenue effects can offset the burden on local communities is expected to emerge as a major issue in future data center policy.